Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLF 3 Vallees 2


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Val Thorens
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift 3 Vallees 2 
Type 4-CLF 
Lift manufacturer GMM 
Year of construction 1993 
Commissioning date 1993
Date of closing down 2013
Date of pull down 2013

geometric data  
Height of valley station 2550 m
Height of mountain station 2837 m
Vertical rise 287 m
Route distance 850 m
Horizontal length ?? m
Average incline 36 %
Largest incline 71 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 3,9 m
Trackwidth line 4,4 m
Trackwidth return 4,4 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2110 Pers/h
Travel time 6,17 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 240 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Montaz Mautino
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 110 Stk
Cab distance 15,69 m
Cab interval 6,8 s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/02/17 22:03:07
PHOTOS: 20/08/06 21:03:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5117 visit(s) since 07/11/03
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 1962
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/1962/datas.htm