Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Krimml X-Press


Valley station
Valley station

middle station
middle station

Middle Station
Middle Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
2 Middle stations.

General information  
Place Zell am Ziller
resort Zillertal Arena
Zillertaler Superskipass
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Krimml X-Press 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 2053 m
Height of middle station(s) 2405 m
Height of mountain station 2502 m
Vertical rise 449/97 m
Route distance 2904 m
Horizontal length ?? m
Average incline 19,00 %
Largest incline 36,00 %
Number of pillars 28 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 11,2 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 5838 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 750 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 172 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/02/19 20:38:36
PHOTOS: 22/07/05 21:41:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
15442 visit(s) since 08/01/03
Last visit 14/10/19

LIFT-WORLD IDs
Lift-ID: 2008
Place-ID: 64

https://www.seilbahntechnik.net/en/lifts/2008/datas.htm