Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Rosenalmbahn 1


Valley station
Valley station

Valley station
Valley station





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Zell am Ziller
resort Zillertal Arena
Zillertaler Superskipass
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Rosenalmbahn 1 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ??

geometric data  
Height of valley station 579 m
Height of mountain station 1309 m
Vertical rise 730 m
Route distance 1910 m
Horizontal length ?? m
Average incline 42,10 %
Largest incline 75,70 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2880 Pers/h
Travel time 5,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model X8
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 86 Stk
Cab distance 60 m
Cab interval 10 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 06/08/17 12:14:07
PHOTOS: 22/07/05 21:52:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
15272 visit(s) since 08/01/03
Last visit 26/08/19

LIFT-WORLD IDs
Lift-ID: 2009
Place-ID: 64

https://www.seilbahntechnik.net/en/lifts/2009/datas.htm