Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Trittalpbahn


Valley station
Valley station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
The chairs were equipped in 2006 with bubbles and seat heaters, also a garage for the chairs has been built!

General information  
Place Zuers
resort Ski Arlberg
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Trittalpbahn 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2003/06 
Commissioning date 28/11/03

geometric data  
Height of valley station 1878 m
Height of mountain station 2166 m
Vertical rise 288 m
Route distance 887,89 m
Horizontal length ?? m
Average incline 34,24 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 3,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 1960 m
Total weight of haul rope 13 t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 2,80 m

electrical data  
Electrical control STG 
Remote control and telemonitoring system STG 
Power control system STG 
Number of drive 1 Stk
Drive power (Start) 530 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 49 Stk
Cab distance 41,54 m
Cab interval 8 s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 25/10/18 21:15:22
PHOTOS: 28/04/04 09:36:02

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11113 visit(s) since 08/03/03
Last visit 22/10/19

LIFT-WORLD IDs
Lift-ID: 2021
Place-ID: 341

https://www.seilbahntechnik.net/en/lifts/2021/datas.htm