Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Fertazza












Infos for handicapped persons
Sorry, no information available.

Characteristics
http://www.funivie.org/pagine/speciali/cld_fertazza/index.php

General information  
Place Selva di Cadore
resort
Dolomiti Superski
Region Veneto
Country IT Italy, Italia
Name of lift Fertazza 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 1841 m
Height of middle station(s) ?? m
Height of mountain station 2081 m
Vertical rise 240 m
Route distance 930 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval 6 s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 13/11/15 20:14:10
PHOTOS: 28/01/09 17:50:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5238 visit(s) since 12/03/05
Last visit 23/10/19

LIFT-WORLD IDs
Lift-ID: 2036
Place-ID: 1595

https://www.seilbahntechnik.net/en/lifts/2036/datas.htm