Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Lärchkogelbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Schladming
resort Schladming Dachstein Tauern
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Lärchkogelbahn 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2020 
Commissioning date 24/12/20

geometric data  
Height of valley station 1337 m
Height of mountain station 1759 m
Vertical rise 422 m
Route distance 1227 m
Horizontal length 1146 m
Average incline 49,1 %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3500 Pers/h
Travel time 3,44 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 717 kW
Drive power (Operation) 797 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour yellow
Seating leather
Seat heater yes
Persons per cab
Number of cabs 61 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs 8  EUR 
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/04/21 21:11:39
PHOTOS: 02/01/21 20:55:06

Lift-Statistics
662 visit(s) since 07/12/20
Last visit 06/05/21

LIFT-WORLD IDs
Lift-ID: 20435
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/20435/datas.htm