Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


26-BGD Eigerexpress





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place
resort Jungfrau
Region Berne
Country CH Switzerland, Confoederatio Helvetica
Name of lift Eigerexpress 
Type 26-BGD 
Lift manufacturer Garaventa 
Year of construction 2018/20 
Commissioning date 05/12/20

geometric data  
Height of valley station 937 m
Height of mountain station 2328 m
Vertical rise 1385 m
Route distance 6483 m
Horizontal length ?? m
Average incline 21,9 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth 1220 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 15 min
Driving speed line 8 m/s

rope data  
Rope manufacturer Fatzer 
Length of carrying rope ?? m
Length of traction rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Carrying rope diameter 58 mm
Traction rope diameter 56 mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Number of carrying rope ?? Stk
Tensionstation carryingrope ??
Tensionstation tractionrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1500 kW
Drive power (Operation) 1950 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ATRIA
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 26 
Number of cabs 44 Stk
Cab distance 42 m
Cab interval 336 s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 750,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 30 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/08/21 17:21:47
PHOTOS: ????

Lift-Statistics
1335 visit(s) since 09/12/20
Last visit 24/09/21

LIFT-WORLD IDs
Lift-ID: 20466
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/20466/datas.htm