Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6/10-CGD Tulfein Express (Glungezer II)


Valley Station
Valley Station

Line
Line





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Tulfes
resort
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Tulfein Express (Glungezer II) 
Type 6/10-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date ??

geometric data  
Height of valley station 1565 m
Height of mountain station 2058 m
Vertical rise 493 m
Route distance 2003 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1093 (2000) Pers/h
Travel time 7,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 372 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A108C
Cab manufacturer CWA
Cab model ??
Bubble colour
Seating Icolan
Seat heater no
Persons per cab 6/10 
Number of cabs 44 (69) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left
Construction costs 8,970,000  EUR 
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season
Situation of entrance ??
Situation of exit ??
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/08/21 20:51:31
PHOTOS: 08/02/21 07:50:06

Lift-Statistics
1087 visit(s) since 08/12/20
Last visit 24/09/21

LIFT-WORLD IDs
Lift-ID: 20481
Place-ID: 574

https://www.seilbahntechnik.net/en/lifts/20481/datas.htm