Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Kapellenbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Waidring
resort Steinplatte
3 Laender Freizeit-Arena
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Kapellenbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date 2020

geometric data  
Height of valley station 1277 m
Height of mountain station 1540 m
Vertical rise 273 m
Route distance 1411 m
Horizontal length 1379 m
Average incline 20 %
Largest incline 45 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,7 m
Trackwidth return 7,7 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 1540 m
Maximum capacity 3200 Pers/h
Travel time 5,31 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1866 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 565 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type D5000
Cab manufacturer Doppelmayr
Cab model DCD 8
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 70 Stk
Cab distance 45 m
Cab interval 9 s
Garage type underground
Garage place mountain station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/02/21 17:36:36
PHOTOS: 25/12/20 07:59:34

Lift-Statistics
638 visit(s) since 08/12/20
Last visit 14/04/21

LIFT-WORLD IDs
Lift-ID: 20485
Place-ID: 6

https://www.seilbahntechnik.net/en/lifts/20485/datas.htm