Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Kapellenbahn










General information  
Place Waidring 
resort 3 Laender Freizeit-Arena 
Region Tyrol 
Country   
Name of lift Kapellenbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date 12 / 2020 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1267 m
Height of mountain station 1540 m
Vertical rise 273 m
Route distance 1407 m
Horizontal length 1379 m
Average incline 20 %
Largest incline 45 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance 20 m
Trackwidth drive 7,2 m
Trackwidth line 7,7 m
Trackwidth return 7,2 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 1540 m
Maximum capacity 3200 Pers/h
Travel time 5,31 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 565 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 70 Stk
Cab distance 45 m
Cab interval 9 s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1866 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/02/24
PHOTOS: ??

Lift-Statistics
6287 visit(s) since 08/12/20
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 20485
Place-ID: 6

https://www.seilbahntechnik.net/en/lifts/20485/datas.htm