Lift-Database » Lifts in the world

  6-CLD Spitzeckbahn










General information  
Place Bad Kleinkirchheim 
resort ?? 
Region Carinthia 
Country   
Name of lift Spitzeckbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date 2 déc. 2020 


Infos for handicapped persons
Sorry, no information available.

Characteristics
First D-Line in Carinthia

geometric data  
Height of valley station 1637 m
Height of mountain station 1914 m
Vertical rise 278 m
Route distance 864 m
Horizontal length ?? m
Average incline 28,5 %
Largest incline 46 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2300 Pers/h
Travel time 3,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 387 kW
Drive power (Operation) 295 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 36 (42) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 21 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18 déc. 2023
PHOTOS: ??

Lift-Statistics
5353 visit(s) since 8 déc. 2020
Last visit 11 mai 2025