Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD König Laurin 1





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Welschnofen
resort
Dolomiti Superski
Region , Trentino-Alto Adige
Country IT Italy, Italia
Name of lift König Laurin 1 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date ??

geometric data  
Height of valley station 1730 m
Height of mountain station 2000 m
Vertical rise 270 m
Route distance 869 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 (2400) Pers/h
Travel time 2,5 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 21 (28) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/01/21 10:32:39
PHOTOS: ????

Lift-Statistics
232 visit(s) since 21/01/21
Last visit 20/04/21

LIFT-WORLD IDs
Lift-ID: 20576
Place-ID: 1662

https://www.seilbahntechnik.net/en/lifts/20576/datas.htm