Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Kumme - Unterrothorn





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zermatt
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Kumme - Unterrothorn 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2020 
Commissioning date 19/12/20

geometric data  
Height of valley station 2660 m
Height of mountain station 3100 m
Vertical rise 440 m
Route distance 1847 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 6,3 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs 23,800,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 7 months
Seasontime winter
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/10/21 16:49:51
PHOTOS: ????

Lift-Statistics
474 visit(s) since 22/01/21
Last visit 15/10/21

LIFT-WORLD IDs
Lift-ID: 20578
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/20578/datas.htm