Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-BGD Nebelhorn II





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Oberstdorf
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Nebelhorn II 
Type 10-BGD 
Lift manufacturer Leitner 
Year of construction 2019/21 
Commissioning date 22/05/21

geometric data  
Height of valley station 1280 m
Height of mountain station 1932 m
Vertical rise 652 m
Route distance 2534,45 m
Horizontal length 2447,25 m
Average incline ?? %
Largest incline ?? %
Number of pillars 3 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 6,08 min
Driving speed line 7 m/s

rope data  
Rope manufacturer ??
Length of carrying rope ?? m
Length of traction rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Carrying rope diameter 55 mm
Traction rope diameter 42 mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Number of carrying rope 1 Stk
Tensionstation carryingrope ??
Tensionstation tractionrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Siemens 
Power control system ??
Number of drive ?? Stk
Drive power (Start) 617 kW
Drive power (Operation) 473 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive hydraulic
Traction of emergency drive electrical

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model Symphony 10
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab 10 
Number of cabs 32 Stk
Cab distance 210 m
Cab interval 30 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs 55,000,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system yes
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/10/21 20:38:28
PHOTOS: ????

Lift-Statistics
696 visit(s) since 06/05/21
Last visit 25/10/21

LIFT-WORLD IDs
Lift-ID: 20668
Place-ID: 152

https://www.seilbahntechnik.net/en/lifts/20668/datas.htm