Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Roßbachbahn

Valley Station
Valley Station

General information  
Place Heiligenblut 
resort Sunny Card 
Region Carinthia 
Country   
Name of lift Roßbachbahn 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1992 
Commissioning date 1992 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1315 m
Height of middle station(s) ?? m
Height of mountain station 1753 m
Vertical rise 438 m
Route distance 1193 m
Horizontal length ?? m
Average incline ?? %
Largest incline 90,00 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 4,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 420 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 4s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 54 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/03/24
PHOTOS: ??

Lift-Statistics
13673 visit(s) since 19/09/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 2071
Place-ID: 173

https://www.seilbahntechnik.net/en/lifts/2071/datas.htm