Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGFJ Tunnelbahn Fleissalm

Line
Line

Cabins
Cabins

Cabins
Cabins

General information  
Place Heiligenblut 
resort Sunny Card 
Region Carinthia 
Country   
Name of lift Tunnelbahn Fleissalm 
Type 6-MGFJ 
Lift manufacturer Waagner Biro 
Year of construction 1987 
Commissioning date ?? 

Infos for handicapped persons
Sorry, no information available.

Characteristics
Hanging rail tunnel. Mixture of many types of cable car, including BSB Funitel, GPB, MGF, and indeed many more.
Only circulating in a tunnel cable car.

geometric data  
Height of valley station 1753 m
Height of mountain station 1810 m
Vertical rise 57 m
Route distance 1600 m
Horizontal length ?? m
Average incline ?? %
Largest incline 45 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 550 Pers/h
Travel time 5,5 min
Driving speed line 7 m/s
Speed on towers ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model Austro Panorama 6 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 22 Stk

rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/08/21
PHOTOS: ??

Lift-Statistics
25604 visit(s) since 02/12/02
Last visit 03/10/22

LIFT-WORLD IDs
Lift-ID: 2075
Place-ID: 173

https://www.seilbahntechnik.net/en/lifts/2075/datas.htm