Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Alpjoch





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Imst
resort
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Alpjoch 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2021 
Commissioning date 17/12/21

geometric data  
Height of valley station 1487 m
Height of mountain station 2020 m
Vertical rise 533 m
Route distance 1487 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 7 min
Driving speed line 5 m/s
Driving speed station 0,33 m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 2980 m
Total weight of haul rope 29 t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 5 m

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab 10 
Number of cabs 20 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 20,500,000  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/12/21 19:38:41
PHOTOS: ????

Lift-Statistics
441 visit(s) since 13/11/21
Last visit 16/01/22

LIFT-WORLD IDs
Lift-ID: 20805
Place-ID: 146

https://www.seilbahntechnik.net/en/lifts/20805/datas.htm