Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Swift Current



General information  
Place Big Sky 
resort Ikon Pass 
Region Montana 
Country   
Name of lift Swift Current 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2020/21 
Commissioning date 11 / 2021 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 505 m
Route distance 2530 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour blue 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 126 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/04/24
PHOTOS: ??

Lift-Statistics
2579 visit(s) since 23/12/21
Last visit 04/11/24

LIFT-WORLD IDs
Lift-ID: 20811
Place-ID: 2443

https://www.seilbahntechnik.net/en/lifts/20811/datas.htm