Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Torri II (Cianzopè - Bai de Dones)





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Cortina d'Ampezzo
resort Dolomiti Superski

Region Veneto
Country IT Italy, Italia
Name of lift Torri II (Cianzopè - Bai de Dones) 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2020/21 
Commissioning date 2021

geometric data  
Height of valley station 1732,1 m
Height of mountain station 1884,88 m
Vertical rise 152,7 m
Route distance 2444 m
Horizontal length 2419 m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 470 kW
Drive power (Operation) 660 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 36 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/01/22 09:29:09
PHOTOS: ????

Lift-Statistics
52 visit(s) since 22/12/21
Last visit 16/01/22

LIFT-WORLD IDs
Lift-ID: 20846
Place-ID: 1382

https://www.seilbahntechnik.net/en/lifts/20846/datas.htm