Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Toè










General information  
Place Canazei 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Toè 
Type 4-CLD 
Lift manufacturer Agamatic 
Year of construction 1988 
Commissioning date ?? 
Date of closing down 2007 
Date of pull down 2007 


Infos for handicapped persons
Sorry, no information available.

Characteristics
sold to Wierchomla (Szczawnik I), Poland

geometric data  
Height of valley station 1932 m
Height of mountain station 2266 m
Vertical rise 334 m
Route distance 1228 m
Horizontal length 1167 m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2232 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control BMB 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 456 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Agamatic 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 94 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/23
PHOTOS: ??

Lift-Statistics
13610 visit(s) since 21/02/05
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 2097
Place-ID: 1336

https://www.seilbahntechnik.net/en/lifts/2097/datas.htm