Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Colorado Superchair

Valley Station
Valley Station

Valley Station
Valley Station

Line
Line

General information  
Place Breckenridge 
resort ?? 
Region Colorado 
Country   
Name of lift Colorado Superchair 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1986 
Commissioning date 1986 
Date of closing down 2014 
Date of pull down 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 3040 m
Height of mountain station 3444 m
Vertical rise 404 m
Route distance 1097 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 6,3 min
Driving speed line 5,08 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 153 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01.11.2017
PHOTOS: ??

Lift-Statistics
5186 visit(s) since 19.03.2005
Last visit 12.05.2025

LIFT-WORLD IDs
Lift-ID: 2106
Place-ID: 2296

https://www.seilbahntechnik.net/en/lifts/2106/datas.htm