Lift-Database » Lifts in the world

  4-CLD Filzsteinbahn Speedy

Mountain Station
Mountain Station

Valley Station
Valley Station

Line
Line

General information  
Place Krimml 
resort ?? 
Region Salzburg 
Country   
Name of lift Filzsteinbahn Speedy 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1674 m
Height of mountain station 1991 m
Vertical rise 317 m
Route distance 1350 m
Horizontal length ?? m
Average incline ?? %
Largest incline 46,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5,0 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 86 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/24
PHOTOS: ??

Lift-Statistics
20204 visit(s) since 15/08/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 2138
Place-ID: 439

https://www.seilbahntechnik.net/en/lifts/2138/datas.htm