Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Hörnlebahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Manufacturer according to Alpinforum: Schwebelift- und Transportbahn Baugesellschaft München

General information  
Place Bad Kohlgrub
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Hörnlebahn 
Type 2-CLF 
Lift manufacturer ??
Year of construction 1953 
Commissioning date ??

geometric data  
Height of valley station 940 m
Height of mountain station 1395 m
Vertical rise 455 m
Route distance 1998 m
Horizontal length ?? m
Average incline 25 %
Largest incline 100 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 3,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 400 Pers/h
Travel time 17,0 min
Driving speed line 2,0 m/s

rope data  
Rope manufacturer Schwaigers 
Length of haul rope 4015 m
Total weight of haul rope ?? t
Haul rope diameter 26 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 110 kW
Drive power (Operation) 103 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 80 Stk
Cab distance 49 m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime ??
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 02/08/16 21:38:45
PHOTOS: 15/08/04 16:36:08

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9921 visit(s) since 29/12/02
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 2145
Place-ID: 272

https://www.seilbahntechnik.net/en/lifts/2145/datas.htm