Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Hössbahn










General information  
Place Hinterstoder 
resort ?? 
Region Upper Austria 
Country   
Name of lift Hössbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2022 
Commissioning date 24/12/22 


Infos for handicapped persons
step-free access (except via ski bridge)

Characteristics
took over the old gondola's operation mid-season

geometric data  
Height of valley station 593 m
Height of mountain station 1404 m
Vertical rise 811 m
Route distance 2606 m
Horizontal length ?? m
Average incline 31,1 %
Largest incline 74,4 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance 26 m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3195 Pers/h
Travel time 6,7 min
Driving speed line 6,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 1298 kW
Drive power (Operation) 998 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - Evo Xline deep 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 89 Stk
Cab distance 73,23 m
Cab interval 11,27 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 5350 m
Total weight of haul rope 77 t
Haul rope diameter 58 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/04/24
PHOTOS: ??

Lift-Statistics
2234 visit(s) since 10/12/22
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 21961
Place-ID: 434

https://www.seilbahntechnik.net/en/lifts/21961/datas.htm