Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Sairon



General information  
Place Morillon 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Sairon 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2022 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1075 m
Height of mountain station 1708 m
Vertical rise 634 m
Route distance 2902 m
Horizontal length 2775 m
Average incline 22,92 %
Largest incline 56,50 %
Number of pillars 23 Stk
Greatest spanwidth 185 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3300 Pers/h
Travel time 7,9 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive electrical 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 151 Stk
Cab distance 40 m
Cab interval 6,5 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope 63 t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/04/23
PHOTOS: ??

Lift-Statistics
503 visit(s) since 07/01/23
Last visit 11/05/24

LIFT-WORLD IDs
Lift-ID: 22110
Place-ID: 1143

https://www.seilbahntechnik.net/en/lifts/22110/datas.htm