Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Achenrainbahn


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Obertauern
resort Lungo
Region Salzburg
Country AT Austria, Österreich
Name of lift Achenrainbahn 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 2003

geometric data  
Height of valley station 1638 m
Height of mountain station 1846 m
Vertical rise 208 m
Route distance 853 m
Horizontal length ?? m
Average incline 26,35 %
Largest incline 64,94 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 2,75 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 282 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104G
Cab manufacturer Doppelmayr
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 61 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3,5 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway yes
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 12/10/18 22:40:24
PHOTOS: 25/12/04 15:46:40

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10226 visit(s) since 20/04/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 2227
Place-ID: 81

https://www.seilbahntechnik.net/en/lifts/2227/datas.htm