Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  135-FUC Parsennbahn 2







Parsennbahn with EM2008-ad
Parsennbahn with EM2008-ad

General information  
Place Davos 
resort Pischa 
Region Grisons 
Country   
Name of lift Parsennbahn 2 
Type 135-FUC 
Lift manufacturer von Roll 
Year of construction 1932 
Commissioning date ?? 
Date of closing down 2010 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2219 m
Height of middle station(s) 2310 m
Height of mountain station 2663 m
Vertical rise 443,37 m
Route distance 2217 m
Horizontal length 2173 m
Average incline ?? %
Largest incline 31 %
Trackwidth drive ?? m
Trackwidth line 0,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1160 Pers/h
Travel time 7 min
Driving speed line 6,0 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 441 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer SIG 
Cab model ?? 
Seating none 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 135 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 34 mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/04/16
PHOTOS: ??

Lift-Statistics
13419 visit(s) since 11/02/03
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 2242
Place-ID: 1728

https://www.seilbahntechnik.net/en/lifts/2242/datas.htm