Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Gipfelbahn


Topstsatio
Topstsatio








Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Rauris
resort Hochalmbahnen
Region Salzburg
Country AT Austria, Österreich
Name of lift Gipfelbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date 2002

geometric data  
Height of valley station 1649 m
Height of middle station(s) ?? m
Height of mountain station 2174 m
Vertical rise 525 m
Route distance 2284,15 m
Horizontal length ?? m
Average incline 23,62 %
Largest incline 41,81 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1434 (1812) Pers/h
Travel time 6,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Swoboda
Cab model ULTRA 8 S
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 44 (55) Stk
Cab distance 120,49 (95,39) m
Cab interval 20,08 (15,90) s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/01/18 21:31:53
PHOTOS: 20/02/18 21:40:23

Lift-Statistics
8780 visit(s) since 26/04/03
Last visit 22/06/21

LIFT-WORLD IDs
Lift-ID: 2279
Place-ID: 255

https://www.seilbahntechnik.net/en/lifts/2279/datas.htm