Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Grafenberg-Express II










General information  
Place Wagrain 
resort ?? 
Region Salzburg 
Country   
Name of lift Grafenberg-Express II 
Type 6-CLD/B 
Lift manufacturer Girak-Garaventa 
Year of construction 2001 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1236 m
Height of mountain station 1715,5 m
Vertical rise 479,5 m
Route distance 1934 m
Horizontal length ?? m
Average incline ?? %
Largest incline 55,77 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 734 kW
Drive power (Operation) 583 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 94 Stk
Cab distance ?? m
Cab interval 9,0 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/02/22
PHOTOS: ??

Lift-Statistics
28256 visit(s) since 26/11/02
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 235
Place-ID: 213

https://www.seilbahntechnik.net/en/lifts/235/datas.htm