Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Hahnkopfbahn




Valley station
Valley station

Valley station
Valley station

General information  
Place Auffach 
resort ?? 
Region Tyrol 
Country   
Name of lift Hahnkopfbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1612 m
Height of mountain station 1887 m
Vertical rise 275 m
Route distance 1221 m
Horizontal length ?? m
Average incline 23,20 %
Largest incline 41,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2540 Pers/h
Travel time 4,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E95 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/01/21
PHOTOS: ??

Lift-Statistics
25168 visit(s) since 02/07/03
Last visit 30/12/24

LIFT-WORLD IDs
Lift-ID: 238
Place-ID: 83

https://www.seilbahntechnik.net/en/lifts/238/datas.htm