Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Dorado


Valley Station
Valley Station

Pylone
Pylone

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Zakopane
resort
Region Lesser Poland, Małopolskie
Country PL Poland, Polska
Name of lift Dorado 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date ??

geometric data  
Height of valley station 875 m
Height of mountain station 1136 m
Vertical rise 261 m
Route distance 1322 m
Horizontal length 1291 m
Average incline 20,22 %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 390 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 79 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 18/04/14 18:02:00
PHOTOS: 01/03/08 13:58:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4822 visit(s) since 30/05/03
Last visit 23/08/19

LIFT-WORLD IDs
Lift-ID: 239
Place-ID: 317

https://www.seilbahntechnik.net/en/lifts/239/datas.htm