Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Gamskogelbahn I










General information  
Place Zauchensee 
resort ?? 
Region Salzburg 
Country   
Name of lift Gamskogelbahn I 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 12 / 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1370,7 m
Height of mountain station 1884,20 m
Vertical rise 513,50 m
Route distance 1245,54 m
Horizontal length 1127,35 m
Average incline 45,55 %
Largest incline 73,91 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,5 m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) 173,5 °
Drive altitude of site 1882 m
Maximum capacity 2400 Pers/h
Travel time 4,23 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 662 kW
Drive power (Operation) 528 kW
Brake power -516 kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 62 Stk
Cab distance 45,00 m
Cab interval 9,00 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2548 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope 2060 N/mm²
Breaking strength of rope 1563,70 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/04/24
PHOTOS: ??

Lift-Statistics
23949 visit(s) since 18/01/03
Last visit 07/12/24

LIFT-WORLD IDs
Lift-ID: 241
Place-ID: 4

https://www.seilbahntechnik.net/en/lifts/241/datas.htm