Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Stubnerkogelbahn II

Mountain Station
Mountain Station

Line
Line

General information  
Place Bad Gastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Stubnerkogelbahn II 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date 12 / 1987 
Date of closing down 2009 
Date of pull down 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1796 m
Height of mountain station 2233 m
Vertical rise 437 m
Route distance 1039 m
Horizontal length ?? m
Average incline ?? %
Largest incline 75,40 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2375 Pers/h
Travel time 3,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 148 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/06/23
PHOTOS: ??

Lift-Statistics
14847 visit(s) since 17/05/03
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 2424
Place-ID: 246

https://www.seilbahntechnik.net/en/lifts/2424/datas.htm