Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Jungeralm


Mountain station
Mountain station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
First 4-seater chairlift in Austria.

General information  
Place Bad Gastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Jungeralm 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1984 
Commissioning date 1984

geometric data  
Height of valley station 1647 m
Height of mountain station 2172 m
Vertical rise 525 m
Route distance 1656 m
Horizontal length ?? m
Average incline ?? %
Largest incline 69,40 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 5,6 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way 3,4 m

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 103
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 144 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 24/03/18 07:02:42
PHOTOS: 12/02/04 14:25:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14313 visit(s) since 24/04/03
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 2427
Place-ID: 246

https://www.seilbahntechnik.net/en/lifts/2427/datas.htm