Lift-Database » Lifts in the world
10-MGD Streuböden I
General information | |
---|---|
Place | Fieberbrunn |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Streuböden I |
Type | 10-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2024 |
Commissioning date | 12 / 2024 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
number of cabins for both sections together |
geometric data | |
---|---|
Height of valley station | 839 m |
Height of mountain station | 1209 m |
Vertical rise | 370 m |
Route distance | 1411 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | ?? Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2500 Pers/h |
Travel time | ?? min |
Driving speed line | 6 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | ?? |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | Omega V - 10 |
Seating | leather |
Seat heater | ?? |
Heater | no |
Aircon | no |
Persons per cab | 10 |
Number of cabs | 95 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | underground |
Garage place | mountain station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 9 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | F1 |
Updates
Datas: 06/11/24
PHOTOS: ??
Lift-Statistics
129 visit(s) since 18/09/23
Last visit 13/11/24
LIFT-WORLD IDs
Lift-ID: 24758
Place-ID: 50
https://www.seilbahntechnik.net/en/lifts/24758/datas.htm
Datas: 06/11/24
PHOTOS: ??
Lift-Statistics
129 visit(s) since 18/09/23
Last visit 13/11/24
LIFT-WORLD IDs
Lift-ID: 24758
Place-ID: 50
https://www.seilbahntechnik.net/en/lifts/24758/datas.htm