Lift-Database » Lifts in the world
2-CLF Männlichen
General information | |
---|---|
Place | Grindelwald |
resort | Jungfrau |
Region | Berne |
Country | |
Name of lift | Männlichen |
Type | 2-CLF |
Lift manufacturer | Habegger |
Year of construction | 1960 |
Commissioning date | ?? |
Date of closing down | 1990 |
Date of pull down | 1990 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1795 m |
Height of mountain station | 2229 m |
Vertical rise | 434 m |
Route distance | 1863 m |
Horizontal length | ?? m |
Average incline | 24,2 % |
Largest incline | 74,3 % |
Number of pillars | ?? Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1000 Pers/h |
Travel time | ?? min |
Driving speed line | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | ?? |
Cab model | ?? |
Seating | ?? |
Seat heater | ?? |
Persons per cab | 2 |
Number of cabs | ?? Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | ?? |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ?? |
Loading carpet | ?? |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 03/11/24
PHOTOS: ??
Lift-Statistics
95 visit(s) since 18/09/23
Last visit 02/12/24
LIFT-WORLD IDs
Lift-ID: 24782
Place-ID: 1724
https://www.seilbahntechnik.net/en/lifts/24782/datas.htm
Datas: 03/11/24
PHOTOS: ??
Lift-Statistics
95 visit(s) since 18/09/23
Last visit 02/12/24
LIFT-WORLD IDs
Lift-ID: 24782
Place-ID: 1724
https://www.seilbahntechnik.net/en/lifts/24782/datas.htm