Lift-Database » Lifts in the world

  8-CLD/B Kaiblinggrat



General information  
Place Haus im Ennstal 
resort ?? 
Region Styria 
Country   
Name of lift Kaiblinggrat 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date 30/11/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Summer operations with gondola cabins is technically possible.
LeitPilot (first time in Austria)

geometric data  
Height of valley station 1414 m
Height of mountain station 1868 m
Vertical rise 454 m
Route distance 1442 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 4,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 704 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model EVO 8 
Bubble colour yellow 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 68 Stk
Cab distance 48,0 m
Cab interval 8,0 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3100 m
Total weight of haul rope 34 t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/12/24
PHOTOS: ??

Lift-Statistics
378 visit(s) since 18/09/23
Last visit 14/12/24