Lift-Database » Lifts in the world
6-CLD/B Tröglbahn
General information | |
---|---|
Place | Hermagor |
resort | ?? |
Region | Carinthia |
Country | |
Name of lift | Tröglbahn |
Type | 6-CLD/B |
Lift manufacturer | Doppelmayr |
Year of construction | 2024 |
Commissioning date | 06/12/24 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1412 m |
Height of mountain station | 1861 m |
Vertical rise | 449 m |
Route distance | 1773 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 18 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 3000 Pers/h |
Travel time | ?? min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | Doppelmayr |
Power control system | Doppelmayr |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | ?? |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | ?? |
Bubble colour | blue |
Seating | leather |
Seat heater | yes |
Persons per cab | 6 |
Number of cabs | 90 Stk |
Cab distance | 43,2 m |
Cab interval | 7,2 s |
Garage type | ground floor |
Garage place | valley station |
Garage direction | forward |
Loading direction | backward |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | ?? months |
Seasontime | ❄ winter |
Situation of entrance | parallel |
Situation of exit | 90° |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | 25 |
Updates
Datas: 30/11/24
PHOTOS: ??
Lift-Statistics
256 visit(s) since 18/09/23
Last visit 14/12/24
LIFT-WORLD IDs
Lift-ID: 24804
Place-ID: 193
https://www.seilbahntechnik.net/en/lifts/24804/datas.htm
Datas: 30/11/24
PHOTOS: ??
Lift-Statistics
256 visit(s) since 18/09/23
Last visit 14/12/24
LIFT-WORLD IDs
Lift-ID: 24804
Place-ID: 193
https://www.seilbahntechnik.net/en/lifts/24804/datas.htm