Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Ochsenkopf Süd



General information  
Place Warmensteinach 
resort ?? 
Region Bavaria 
Country   
Name of lift Ochsenkopf Süd 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date 06/12/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 250 m
Route distance 1824 m
Horizontal length 1803 m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 (1400) Pers/h
Travel time 5,07 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 310 kW
Drive power (Operation) 247 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating leather 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 21 (25) Stk
Cab distance 180 m
Cab interval 30 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/12/24
PHOTOS: ??

Lift-Statistics
214 visit(s) since 18/09/23
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 24812
Place-ID: 1979

https://www.seilbahntechnik.net/en/lifts/24812/datas.htm