Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Eibergbahn










General information  
Place Scheffau 
resort ?? 
Region Tyrol 
Country   
Name of lift Eibergbahn 
Type 8-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2024 
Commissioning date 07/12/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
the world's highest capacity chairlift
L-shaped valley station

geometric data  
Height of valley station 1528 m
Height of mountain station 1683 m
Vertical rise 155 m
Route distance 476,18 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 4570 Pers/h
Travel time 2,26 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 43 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 67 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/12/24
PHOTOS: ??

Lift-Statistics
452 visit(s) since 18/09/23
Last visit 13/12/24

LIFT-WORLD IDs
Lift-ID: 24821
Place-ID: 79

https://www.seilbahntechnik.net/en/lifts/24821/datas.htm