100-FUF Mürren - Birg (Schilthornbahn 2)
General information | |
---|---|
Place | Murren |
resort | ?? |
Region | Berne |
Country | |
Name of lift | Mürren - Birg (Schilthornbahn 2) |
Type | 100-FUF |
Lift manufacturer | Garaventa |
Year of construction | 2023/25 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
opening track 1: 28.11.2025 opening track 2: 13.12.2024 height of support (cable to top of foundation): 55 m |
geometric data | |
---|---|
Height of valley station | 1641,4 m |
Height of mountain station | 2676,58 m |
Vertical rise | 1035,18 m |
Route distance | 2774,00 m |
Horizontal length | ?? m |
Average incline | 40,5 % |
Largest incline | 73,2 % |
Number of pillars | 1 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 11 m |
Trackwidth line | 11 m |
Trackwidth return | 11 m |
Angle of wrap (drive wheel) | 355 ° |
Drive altitude of site | ?? m |
Maximum capacity | 800 Pers/h |
Travel time | 5,0 min |
Driving speed line | 12 m/s |
Speed on towers | 8 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Carvatech |
Cab model | ?? |
Heater | ?? |
Aircon | ?? |
Persons per cab | 100 |
Number of cabs | 2 Stk |
Carriage Operator | no |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of carrying rope | ?? m |
Length of traction rope | ?? m |
Total weight of carrying rope | ?? t |
Total weight of traction rope | ?? t |
Carrying rope diameter | 64 mm |
Traction rope diameter | 30 mm |
Nominal strength of carrying rope | ?? N/mm² |
Nominal strength of traction rope | ?? N/mm² |
Breaking strength of carrying rope | 4595 kN |
Breaking strength of traction rope | 721 kN |
Tensionstation carryingrope | ?? |
Tensionstation tractionrope | Valley station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? CHF |
Currency (Construction costs) | Swiss franc |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
xxxx hier text hin xxxx | no |
Moving platform | no |
Evacuation ropeway | no |
Integrated rescue system | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 06/11/24
PHOTOS: ??
Lift-Statistics
198 visit(s) since 18/09/23
Last visit 20/12/24
LIFT-WORLD IDs
Lift-ID: 24841
Place-ID: 1993
https://www.seilbahntechnik.net/en/lifts/24841/datas.htm
Datas: 06/11/24
PHOTOS: ??
Lift-Statistics
198 visit(s) since 18/09/23
Last visit 20/12/24
LIFT-WORLD IDs
Lift-ID: 24841
Place-ID: 1993
https://www.seilbahntechnik.net/en/lifts/24841/datas.htm