Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Schneekarbahn

Valley station
Valley station

Mountain station
Mountain station

Line
Line

General information  
Place Mayrhofen 
resort Zillertaler Superskipass 
Region Tyrol 
Country   
Name of lift Schneekarbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1622 m
Height of mountain station 2267 m
Vertical rise 645,5 m
Route distance 1701,4 m
Horizontal length 1566,8 m
Average incline 41,20 %
Largest incline 75,46 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,1 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 2267 m
Maximum capacity 2800 Pers/h
Travel time 5,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 921 kW
Drive power (Operation) 749 kW
Brake power -730 kW
Continuous brake power 174 kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 94 Stk
Cab distance 38,6 m
Cab interval 7,7 s
Garage type underground 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3459 m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope 2160 N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/05/23
PHOTOS: ??

Lift-Statistics
26906 visit(s) since 25/11/02
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 249
Place-ID: 22

https://www.seilbahntechnik.net/en/lifts/249/datas.htm