Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Gipfelbahn Fulseck II

Mountain station
Mountain station

Valley station
Valley station

Line
Line

General information  
Place Dorfgastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Gipfelbahn Fulseck II 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1989 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Fulseck 1.

geometric data  
Height of valley station 1470 m
Height of middle station(s) ?? m
Height of mountain station 2027 m
Vertical rise 557 m
Route distance 1909 m
Horizontal length ?? m
Average incline ?? %
Largest incline 55,00 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 8,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval 10,8 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 37 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/01/24
PHOTOS: ??

Lift-Statistics
23763 visit(s) since 13/05/03
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 2499
Place-ID: 244

https://www.seilbahntechnik.net/en/lifts/2499/datas.htm