Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Fimbabahn I

Middle Station
Middle Station

Mountain station
Mountain station




General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Fimbabahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998 
Date of closing down 01/05/07 
Date of pull down 2007 
Second-hand lift. Formerly lift no. 6333 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1371 m
Height of mountain station 1630 m
Vertical rise 259 m
Route distance 1671 m
Horizontal length ?? m
Average incline 16 %
Largest incline 56 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model Austro Panorama 6 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/04/23
PHOTOS: ??

Lift-Statistics
22461 visit(s) since 01/12/02
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 253
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/253/datas.htm