Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


3-CLF Schöngratbahn


Line
Line




Valley station
Valley station


Infos for handicapped persons
Sorry, no information available.

Characteristics
First 3 seat chair lift in Germany!

General information  
Place Bayrischzell
resort Sudelfeld
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Schöngratbahn 
Type 3-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1985 
Commissioning date 1985

geometric data  
Height of valley station 1110 m
Height of mountain station 1428 m
Vertical rise 318 m
Route distance 1250 m
Horizontal length 1125 m
Average incline 27 %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 8,3 min
Driving speed line 2,5 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive mechanical

cabins data  
Grip type 2FG
Cab manufacturer Doppelmayr
Cab model 2E Fix
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 199 Stk
Cab distance 11,9 m
Cab interval 5,4 s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) 16 




This information are for members only visible!



Updates
Datas: 15/04/16 17:34:04
PHOTOS: 29/03/07 22:52:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11714 visit(s) since 09/05/03
Last visit 16/07/19

LIFT-WORLD IDs
Lift-ID: 2531
Place-ID: 159

https://www.seilbahntechnik.net/en/lifts/2531/datas.htm