Lift-Database » Lifts in the world
3-CLF Schöngratbahn

Line


Valley station
General information | |
---|---|
Place | Bayrischzell |
resort | Wendelstein |
Region | Bavaria |
Country | ![]() |
Name of lift | Schöngratbahn |
Type | 3-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 1985 |
Commissioning date | 1985 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
First 3 seat chair lift in Germany! |
geometric data | |
---|---|
Height of valley station | 1110 m |
Height of mountain station | 1428 m |
Vertical rise | 318 m |
Route distance | 1250 m |
Horizontal length | 1125 m |
Average incline | 27 % |
Largest incline | ?? % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2200 Pers/h |
Travel time | 8,3 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | 2FG |
Cab manufacturer | Doppelmayr |
Cab model | 2E Fix |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 3 |
Number of cabs | 172 Stk |
Cab distance | 11,9 m |
Cab interval | 5,4 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? DEM |
Currency (Construction costs) | Deutsche Mark |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | 16 |
Updates
Datas: 29 Dec 2024
PHOTOS: ??
Lift-Statistics
19672 visit(s) since 9 May 2003
Last visit 12 May 2025
LIFT-WORLD IDs
Lift-ID: 2531
Place-ID: 159
https://www.seilbahntechnik.net/en/lifts/2531/datas.htm
Datas: 29 Dec 2024
PHOTOS: ??
Lift-Statistics
19672 visit(s) since 9 May 2003
Last visit 12 May 2025
LIFT-WORLD IDs
Lift-ID: 2531
Place-ID: 159
https://www.seilbahntechnik.net/en/lifts/2531/datas.htm