Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Gampenbahn





Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Ischgl
resort Silvretta Arena

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Gampenbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date 1988
Date of closing down 01/05/18
Date of pull down 02/05/18

geometric data  
Height of valley station 1929 m
Height of mountain station 2853 m
Vertical rise 924 m
Route distance 2414 m
Horizontal length ?? m
Average incline 41,6 %
Largest incline 60,00 %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 8,1 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 159 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) E4 




This information are for members only visible!



Updates
Datas: 24/07/18 20:44:47
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12982 visit(s) since 22/12/02
Last visit 22/10/19

LIFT-WORLD IDs
Lift-ID: 255
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/255/datas.htm