Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


125-FUC Standseilbahn Rosshütte


Inside the waggon
Inside the waggon

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Seefeld
resort Rosshuette
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Standseilbahn Rosshütte 
Type 125-FUC 
Lift manufacturer Vöest-Alpine 
Year of construction 1969 
Commissioning date 20/12/69

geometric data  
Height of valley station 1235 m
Height of mountain station 1762 m
Vertical rise 527 m
Route distance 2417 m
Horizontal length ?? m
Average incline 21,40 %
Largest incline 37,20 %
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 5,0 min
Driving speed line 12,0 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 36 mm
Counter-rope diameter 21 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Gangloff
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab 125 
Number of cabs 2 Stk
Carriage Operator yes

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 10 months
Seasontime ❄ ☀ all-season
Type of turnout ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/03/19 22:20:57
PHOTOS: 20/04/04 21:28:59

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11868 visit(s) since 16/05/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 2551
Place-ID: 113

https://www.seilbahntechnik.net/en/lifts/2551/datas.htm