Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Höllspitzbahn







Valley station
Valley station

General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Höllspitzbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1994/04 
Commissioning date 1994 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1994 m
Height of mountain station 2639 m
Vertical rise 645 m
Route distance 1792 m
Horizontal length ?? m
Average incline 38,8 %
Largest incline 65,8 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 125 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) E2 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/04/23
PHOTOS: ??

Lift-Statistics
20364 visit(s) since 16/02/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 256
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/256/datas.htm