Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Marinzen



General information  
Place Kastelruth / Castelrotto 
resort ?? 
Region Trentino-South Tyrol 
Country   
Name of lift Marinzen 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2024/25 
Commissioning date 01.06.2025 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1054 m
Height of mountain station 1485 m
Vertical rise 428 m
Route distance 1622 m
Horizontal length 1565 m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth 265, m
Max ground clearance 30,6 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 4,55 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA-XL 
Cab manufacturer Sigma 
Cab model DIAMOND - Evo Xline deep 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 28 Stk
Cab distance 144 m
Cab interval ?? s
Garage type station circulation 
Garage place in all stations 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01.07.2025
PHOTOS: ??

Lift-Statistics
609 visit(s) since 01.05.2025
Last visit 08.07.2025

LIFT-WORLD IDs
Lift-ID: 25925
Place-ID: 1431

https://www.seilbahntechnik.net/en/lifts/25925/datas.htm