Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Rivera - Piano di Mora - Alpe Foppa



General information  
Place Monteceneri 
resort ?? 
Region Ticino 
Country   
Name of lift Rivera - Piano di Mora - Alpe Foppa 
Type 8-MGD 
Lift manufacturer BMF 
Year of construction 2024/25 
Commissioning date 15.09.2025 


Infos for handicapped persons
accessible

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 473,15 m
Height of middle station(s) 1125,60 m
Height of mountain station 1525,20 m
Vertical rise 1052,05 m
Route distance 2530 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 Pers/h
Travel time 10 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 630 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model Panorama 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab
Number of cabs 34 Stk
Cab distance 180 m
Cab interval 36 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13.09.2025
PHOTOS: ??

Lift-Statistics
267 visit(s) since 13.09.2025
Last visit 23.09.2025

LIFT-WORLD IDs
Lift-ID: 25988
Place-ID: 2382

https://www.seilbahntechnik.net/en/lifts/25988/datas.htm