Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Höllbodenbahn



General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Höllbodenbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2025 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
AURO (semi-autonomous cable car operation)

geometric data  
Height of valley station 2141 m
Height of mountain station 2379 m
Vertical rise 238 m
Route distance 1265 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 4200 Pers/h
Travel time 4,0 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 70 Stk
Cab distance 41,14 m
Cab interval 6,86 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway ?? 
Asset number (Trail map) C1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19 okt 2025
PHOTOS: ??

Lift-Statistics
104 visit(s) since 19 okt 2025
Last visit 24 okt 2025

LIFT-WORLD IDs
Lift-ID: 26002
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/26002/datas.htm